Steam Plant Operations Dashboard • WSU Facilities Services
Enter the dashboard password to continue.
Loading...
Upload one or more monthly ENERGY Excel files (.xlsx/.xlsm). The dashboard will parse them in-browser using SheetJS and merge into the existing dataset. Duplicate months will be replaced.
Accepts .xlsx and .xlsm files
This dashboard visualizes WSU steam plant operations data covering 5 boilers (B1-B5), 2 steam plants (CASP and GWSP), 3 generators, fuel oil storage, and plant water systems. Data spans from FY21 (July 2020) forward.
| Tab | What It Shows |
|---|---|
| Overview | Campus-wide KPIs, monthly gas/steam trends, fiscal year comparisons |
| Gas Consumption | Gas usage by boiler and plant, oil firing events, monthly breakdown table |
| Steam & Efficiency | Steam production by boiler, efficiency ratios, economizer performance |
| Runtime & Availability | Boiler runtime hours, availability heatmap, generator output |
| Plant Water | GWSP and CASP water usage, makeup temperature trends, waste water |
| Data Management | Import new monthly Excel files, export JSON/CSV, view data inventory |
| Metric | Unit | Definition |
|---|---|---|
| Gas (scf) | Standard cubic feet | Natural gas consumption measured at standard conditions |
| Steam (lbs) | Pounds | Steam produced, measured by mass flow |
| Efficiency Ratio | lbs/scf | Steam output divided by gas input. Higher = more efficient |
| Economizer Delta-T | °F | Temperature gain across economizer (outlet minus inlet). Higher = better heat recovery |
| Runtime | Hours | Cumulative run hours per month for each boiler/generator |
| Oil (lbs) | Pounds | Fuel oil consumed by dual-fuel boilers (B3, B4, B5) |
| kWh | Kilowatt-hours | Electrical energy generated by on-site generators |
steam_plant.json to the GitHub data/ folder| Equipment | Plant | Fuel | Notes |
|---|---|---|---|
| Boiler 1 | CASP | Gas only | Single-fuel boiler |
| Boiler 2 | CASP | Gas only | Single-fuel boiler |
| Boiler 3 | GWSP | Gas + Oil | Dual-fuel, tracks oil separately |
| Boiler 4 | GWSP | Gas + Oil | Dual-fuel, tracks oil separately |
| Boiler 5 | GWSP | Gas + Oil | Dual-fuel, tracks oil separately |
| Generator 1 | — | Gas | Gas-fired generator |
| Generator 2 | — | Gas | Gas-fired generator |
| Generator 3 | — | Diesel | Diesel generator, tracks fuel gallons |
| Issue | Solution |
|---|---|
| Charts not loading | Check that data/steam_plant.json exists. Hard refresh (Ctrl+Shift+R). |
| Import fails | Ensure the file is a valid .xlsx/.xlsm with "Daily Data" and/or "Hourly Data" sheets. |
| Missing months | Check the Data Inventory table. Missing months can be filled by importing the source Excel file. |
| Dark mode stuck | Clear localStorage: open console, run localStorage.removeItem('wsuDarkMode') |